Herriott Services Ltd is a professional brickwork contractor covering Kent, South East London and Surrounding Areas

Tarmac Driveways: Sub-Base Depth, Edging, and Why Preparation Is Everything

5 March 2026 by Michael Swan 2 min read

A tarmac drive laid on a poor sub-base will crack and sink within two years. Here is what proper preparation looks like.

Tarmac (more correctly, bitumen macadam to BS 4987) remains the most cost-effective driveway surface in the UK. A properly laid tarmac drive on a good sub-base will last 15 to 20 years before it needs attention. A drive laid on inadequate preparation will show ruts, cracks, and puddles within two winters. The difference is entirely in what happens before the tarmac goes down.

Sub-Base Specification

We excavate to a minimum of 200mm below the finished surface level. The sub-base is 150mm of compacted MOT Type 1 (a graded crushed stone to BS EN 13285), laid in two lifts and compacted with a vibrating roller. On areas that will take regular vehicle turning (near the road entrance, for example), we increase the sub-base to 200mm. If the existing ground is soft or waterlogged, a geotextile membrane goes down first to prevent the aggregate migrating into the subsoil.

Edging and Restraint

Tarmac needs a solid edge to push against, otherwise it will creep outward and crack along the margins. We use either a concrete edging kerb (haunched with C20 concrete) or a brick border. Brick edging using engineering bricks bedded on concrete adds a smart detail that lifts the whole driveway.

Drainage and Planning

Since 2008, under the GPDO amendments, any impermeable surface over 5m2 requires either permeable surfacing or drainage to a soakaway within your property. Standard dense tarmac is impermeable, so we either specify a porous macadam (more expensive, slightly rougher finish) or ensure the drive falls towards a lawn, border, or drainage channel. See our driveway planning permission guide for the full rules.

View our driveway services or call Herriott Services LTD on 07887 895382 for a free survey and quotation.

Frequently Asked Questions

Yes, always. Without drainage, hydrostatic pressure builds behind the wall and can double the lateral force. We install a perforated drain pipe in gravel at the base of the wall, with weep holes through the face at 1.5 metre centres.
As a general rule, any retaining wall over 1.2 metres should be designed by a structural engineer. Even lower walls on sloping ground or with surcharge loading may need engineering input.
Class B engineering bricks (Staffordshire Blues, Accrington NORI) for the structural element. These have water absorption below 7% and compressive strength above 48 N/mm2, making them suitable for permanent moisture contact.
Minimum 900mm for comfortable single-person use. 1,200mm allows two people to pass. For a grand entrance, 1,500mm or wider. Consistent riser height (150mm) and tread depth (350 to 400mm) are essential for safety.
Yes. Dense concrete blocks or engineering blocks are often used for retaining walls that will be rendered or hidden behind soil. For visible retaining walls, facing brick over a blockwork core is the usual approach.
Share:

Need help with your project?

Contact us today for a free, no-obligation quote.

Get a Quote