Thermal Performance in New Build Walls: Cavity Width, Insulation, and Part L

1 March 2026 by Michael Swan 2 min read

Approved Document Part L sets the thermal performance target. The cavity width, insulation type, and blockwork specification determine whether you hit it.

A new build external wall in 2026 must achieve a U-value of 0.26 W/m2K or better under Approved Document Part L (Conservation of Fuel and Power). That figure determines the combination of insulation thickness, block conductivity, and cavity width that makes up the wall build-up.

Typical Wall Build-Up

The standard specification for a new build in Kent in 2026 is:

  • 102.5mm facing brick outer leaf.
  • 100mm full-fill cavity insulation (Kingspan Kooltherm K106 at 0.018 W/mK, or Celotex CW4000 at 0.022 W/mK).
  • 100mm Thermalite Shield aircrete block inner leaf (0.11 W/mK).
  • 12.5mm plasterboard on dabs.

This achieves a U-value of approximately 0.20 W/m2K, comfortably under the Part L target. Using a denser block for the inner leaf (say, a 7 N/mm2 aggregate block at 1.3 W/mK) would push the U-value above the target unless the cavity insulation thickness is increased to 125mm or 150mm.

Why Clean Cavities Matter

Mortar droppings on wall ties and insulation boards create thermal bridges, cold spots where heat escapes and condensation forms. A clean cavity is not just an NHBC inspection requirement; it directly affects the thermal performance of the finished wall. We use cavity battens (boards that sit on the wall ties during construction, catching droppings and lifted out as the wall rises) to keep the cavity clean.

See our article on new build cavity wall construction for the full specification. View our new build services.

Frequently Asked Questions

A treated timber member (typically 100 x 50mm) bolted to the top of the inner leaf of blockwork. It provides a fixing surface for roof trusses or rafters. It must be dead level across the full length of the building.
The outer leaf is built up following the pitch angle of the roof. Each course is cut to the rake angle using a diamond-blade saw. The verge detail (flush, dry verge, or mortar verge) finishes the junction between brick and roof.
A DPC tray installed within the cavity at eaves level to prevent moisture tracking from the cavity onto the wall plate timber. It directs water outward through weep holes in the outer leaf.
The bricklayer. The wall plate sits on the top course of the inner leaf, so the block courses must be laid to the exact height specified. The tolerance is plus or minus 5mm across the full wall length.
The roof structure can begin once the walls reach plate height and the gable ends are at least partially built. The bricklayer typically returns to complete gable apex brickwork after the roof structure is in place.